Friday, January 9

Master Bathroom Renovation Update


We are in the middle of completely renovating our master bathroom. Earlier I posted a before and after photo showing the gutting -- where they tore out the entire room -- toilet, bathtub, sink, floor, walls, and ceiling (http://mkr20003.blogspot.com/2009/01/bathroom-guts.html). These pictures show some progress. They put down a plywood floor and have done the pipes and lights. We had to reorder our tile, because it was $6,000 over our budget. We are still going to be way over our tile budget, but we did find a less expensive tile that looks just as good. We had a meeting with the contractor at 7 a.m. this morning to go over some issues, but things seem to be moving along. These photos show the lights above where our shower will be and where our toilet will be. Luckily we have another bathroom to use in the meantime, so we don't have to squat over that hole in the floor.